Submittal conformance

Captured vs. missing against the requirements checklist. Auto-matched; override per item.

Missing required — 1 required item(s) not captured

3 of 4 required submittals captured.

Executive Summary / Proposal narrativeRequired

8.1

Matched: DTE_Overhead_Construction_Xtreme_Submission_Final.pdf

Captured

Exhibit D1 — Unit Pricing RatesRequiredDisqualifying

8.2

Matched: Exhibit_D1_-_Unit_Pricing_Sheet_Final.xlsx

Captured

Exhibit D2 — T&E Pricing RatesRequiredDisqualifying

8.3

Matched: Exhibit_D2_-_TE_Pricing_Sheet_2_Final.xlsx

Captured

Diversity plan (Tier II diverse supplier spend / DEI)RequiredDisqualifying

8.8

Missing

Exceptions / redlines to T&Cs (optional)Optional

8.6

Missing

Ingested files

3 submission(s) on record.

d2 te pricing

d2 te pricing

https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsenu000zcabf8jqwkeam/Exhibit_D2_-_TE_Pricing_Sheet_2_Final.xlsx

parsed

Contractor: Xtreme Powerline Construction, LLC

Labor rates: 141 · Equipment rates: 54

d1 unit pricing

d1 unit pricing

https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsenu000zcabf8jqwkeam/Exhibit_D1_-_Unit_Pricing_Sheet_Final.xlsx

parsed

7997 units across 12 service areas.

Priced: 7985 · Blank: 12

Also parsed 17 hydrovac, 0 traffic rates.

proposal pdf

proposal pdf

https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsenu000zcabf8jqwkeam/DTE_Overhead_Construction_Xtreme_Submission_Final.pdf

parsed

30 pages · 28,676 characters extracted.

DTE Overhead Construction Page 1 of 30
DTE Electric Company | Proposal Submission
PROJECT: DTE
Overhead Construction
No. 238244
DATE: May 22, 2026

-- 1 of 30 --

DTE Overhead Construction Page 2 of 30
Compliance Matrix
Section Title/Requirement Compliant Response Reference
Technical Cover Letter and Executive Summary Page 3-4
Technical Unit Pricing Rates Appendix A
Technical T&E Pricing Rates Appendix B
Technical Company Questionnaire Appendix C
Technical Staffing Plan Appendix D
Technical Organization Chart Appendix E
Technical Diversity Appendix F
Technical Hydrovac Services Recommendation Appendix G
Technical Traffic Control Appendix H
Technical Assumptions and Clarifications Appendix I

-- 2 of 30 --

DTE Overhead Construction Page 3 of 30
May 22, 2026
Xtreme Powerline Construction, LLC.
RFP 238244 – Overhead Construction Services
Xtreme Powerline Construction, LLC. (“Xtreme”) is pleased to submit this proposal in response to DTE
Electric Company’s 2026 Overhead Construction Request for Proposal. We are proud to support DTE’s
commitment to delivering safe, reliable, and cost-effective electric service through high-quality overhead
construction, maintenance, storm response, and emergent work services.
Xtreme has built a long-standing working relationship with DTE and operates as a consistent, dependable
contractor across active service territories. Our approach is centered on safe, repeatable field execution
supported by owned fleet, experienced crews, and proven processes that allow us to deliver reliable
production at scale across multiple service centers, all while maintaining alignment with DTE standards,
specifications, and work practices.
With extensive experience supporting DTE service territories, Xtreme brings deep operational knowledge of
company standards, work management systems, unit-based construction practices, and pre-flight and post-
flight requirements. Our current footprint and proven performance position us to continue supporting the
Caniff,