Upload submission
All file types are stored. D1, D2, and proposal PDFs are parsed when detected.
Submittal conformance
Captured vs. missing against the requirements checklist. Auto-matched; override per item.
3 of 4 required submittals captured.
Executive Summary / Proposal narrativeRequired
8.1
Matched: DTE_RFP_238244_Asplundh_Construction_Proposal_5-22-26.pdf
Exhibit D1 — Unit Pricing RatesRequiredDisqualifying
8.2
Matched: Exhibit_D1_-_Unit_Pricing_Sheet_Asplundh_Construction_LLC_5-22-26.xlsx
Exhibit D2 — T&E Pricing RatesRequiredDisqualifying
8.3
Matched: Exhibit_D2_-_TE_Pricing_Sheet_2_Asplundh_Construction_LLC_5-22-26.xlsx
Diversity plan (Tier II diverse supplier spend / DEI)RequiredDisqualifying
8.8
Exceptions / redlines to T&Cs (optional)Optional
8.6
Matched: DTE_Supplier_Terms__Rev_02-26_-_REDLINE__Rev_01__Asplundh_Construction_Redlines_5-22-26.docx
Ingested files
5 submission(s) on record.
d2 te pricing
d2 te pricing
https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsggz001ncabf0etowphj/Exhibit_D2_-_TE_Pricing_Sheet_2_Asplundh_Construction_LLC_5-22-26.xlsx
Contractor: Asplundh Construction, LLC
Labor rates: 141 · Equipment rates: 54
d1 unit pricing
d1 unit pricing
https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsggz001ncabf0etowphj/Exhibit_D1_-_Unit_Pricing_Sheet_Asplundh_Construction_LLC_5-22-26.xlsx
7997 units across 12 service areas.
Priced: 7996 · Blank: 1
Also parsed 17 hydrovac, 0 traffic rates.
DTE_Supplier_Terms__Rev_02-26_-_REDLINE_(Rev_01)_Asplundh_Construction_Redlines_5-22-26.docx
other · 244 KB
https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsggz001ncabf0etowphj/DTE_Supplier_Terms__Rev_02-26_-_REDLINE__Rev_01__Asplundh_Construction_Redlines_5-22-26.docx
DTE_Supplier_Terms__Rev_02-26_-_REDLINE_(Rev_01)_Asplundh_Construction_Redlines_5-22-26.docx · 212,377 characters ingested
Terms and Conditions for Services TABLE OF CONTENTS DEFINITIONS 3 CONTRACTOR RESPONSIBILITIES 4 INDEPENDENT CONTRACTOR 4 CONTRACTOR’S EMPLOYEES AND MANAGEMENT 4 HIRING AND SUBCONTRACTING 5 COOPERATION AND OTHER CONTRACTS 5 MATERIALS AND EQUIPMENT 5 WORK AREAS AND ACCESS 6 SITE SERVICES AND FACILITIES 6 LINES, GRADES AND MONUMENTS 6 SITE CONDITIONS 6 CLEANUP OF SITE 6 USE OF COMPANY’S EQUIPMENT, PERSONNEL AND FACILITIES 7 SAFETY AND SECURITY 7 REPORTING OF ACCIDENTS AND SECURITY INCIDENTS 7 WORK DOCUMENTS 8 CONTRACTOR SUBMITTALS 8 ELECTRONIC SUBMISSIONS 8 INTERRUPTION OF SERVICES 8 INSPECTION 8 USE OF COMPLETED PORTIONS OF THE WORK 9 LOSS OF OR DAMAGE TO WORK 9 SCHEDULE AND PROGRESS 9 CHANGES 9 DELAYS 10 SUSPENSION 10 COMPANY’S RIGHT TO PERFORM THE WORK 10 DISPUTE RESOLUTION 10 LIENS 11 PAYMENT 11 GENERAL REPRESENTATIONS 11 CONTRACTOR COVENANTS 12 ENVIRONMENTAL COMPLIANCE 12 CONFIDENTIALITY 13 TAXES 14 PERMITS 15 INSURANCE 15 INTELLECTUAL PROPERTY 15 WARRANTY 15 TERMINATION FOR CONVENIENCE 16 TERMINATION FOR CAUSE 16 INDEMNIFICATION 17 LIQUIDATED DAMAGES 17 WAIVER OF CONSEQUENTIAL DAMAGES 17 SET OFF 17 RECORDS AND AUDITS 17 ASSIGNMENT 18 FORCE MAJEURE 18 NON-WAIVER 18 NOTICES 18 SAVING CLAUSE-INDEPENDENT TERMS 18 SURVIVAL 18 NON-EXCLUSIVITY 18 CONSTRUCTION OF TERMS; SECTION HEADINGS 18 GOVERNING LAW AND JURISDICTION 18 ENTIRE AGREEMENT 18 NUCLEAR POWER PLANT ADDITIONAL TERMS 19 U.S. DEPARTMENT OF TRANSPORTATION PIPELINE FACILITY REQUIREMENTS 19 FEDERAL CONTRACTING REQUIREMENTS 19 BACKGROUND INVESTIGATION REQUIREMENTS 19 PROTECTION OF COMPANY DATA 19 VENDOR REMOTE OR ONSITE ACCESS SECURITY 19 NERC CIP COMPLIANCE 19 TERMS AND CONDITIONS FOR EQUIPMENT SERVICE (CONTRACTOR FACILITY) 19 DIVERSITY, EQUITY, AND INCLUSION 20 TERMS AND CONDITIONS FOR SERVICES DEFINITIONS The following terms shall have the following meanings: “Affiliate” means, with respect to any Person, each Person that directly or indirec
Parse strategies tried
- ✓ mammoth_raw
proposal pdf
proposal pdf
https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsggz001ncabf0etowphj/DTE_RFP_238244_Asplundh_Construction_Proposal_5-22-26.pdf
17 pages · 12,974 characters extracted.
RFP NO. 238244 DTE OVERHEAD CONSTRUCTION PROPOSAL MICHAEL FORREST ASPLUNDH CONSTRUCTION, LLC MAY 22, 2026 -- 1 of 17 -- DTE RFP No. 238244 1 of 5 May 22, 2026 Chad Gritzmaker Supply Chain – Strategic Supply Category Manager DTE Energy 1 Energy Plaza Detroit, MI 48226 RE: RFP No. 238244 – DTE Overhead Construction Dear Mr. Gritzmaker, Asplundh Construction is pleased to submit our response to DTE Energy’s Request for Proposal (RFP) No. 238244 for Overhead Construction services. We appreciate the opportunity to participate and value our ongoing engagement with DTE. We have been operating on DTE’s system for many years, giving us a strong understanding of DTE’s operational requirements, standards, and expectations. Our proposal is designed to support dependable execution in the field, with a focus on responsiveness, coordination, and consistent delivery. We have aligned our approach with DTE’s expectations while maintaining the flexibility to respond to DTE’s changing operational demands and priorities. We welcome the opportunity to discuss our proposal further and address any questions during your evaluation. Thank you for your consideration and continued partnership. Sincerely, Michael Forrest Sr. Vice President Asplundh Construction, LLC -- 2 of 17 -- DTE RFP No. 238244 2 of 5 Table of Contents 1.0 Exective Summary .................................................................................. 3 2.0 Exhibit D1 – Unit Pricing Rates................................................................ 4 3.0 Exhibit D2 – T&E Pricing Rates ................................................................ 3 4.0 Company Questionnaire ......................................................................... 4 5.0 Terms & Conditions ................................................................................ 4 6.0 Diversity ................................................................................................. 5 Appendix 1 – DTE Overhead Construction - Asplu
proposal pdf
proposal pdf
https://qokljzaludugmd0a.private.blob.vercel-storage.com/uploads/cmr9dsd2o0000cabfnrp1n6pd/cmr9dsggz001ncabf0etowphj/DTE_Exclusive_Confidentiality_Agreement__Final_2-2026__Asplundh.pdf
4 pages · 11,790 characters extracted.
Rev. 2/2026 Page 1 of 4 EXCLUSIVE CONFIDENTIALITY AGREEMENT This Exclusive Confidentiality Agreement (the “Agreement”) is made and entered into as of March 30th 2026 between [DTE Entity Name] DTE (“DTE”), whose address is One Energy Plaza, Detroit, Michigan 48226, and Asplundh Construction, LLC a NY LLC (“Recipient”), whose address is 93 Sills Road Yaphank NY 11980 each sometimes individually referred to as “Party” or collectively referred to as “Parties”. WHEREAS, Recipient desires that DTE disclose certain Confidential Information relating to the Project; and WHEREAS, DTE desires to protect the confidentiality of such information. NOW, THEREFORE, for and in consideration of DTE’s disclosure of Confidential Information and of the mutual promises contained in this Agreement, each Party agrees as follows: 1. Project. For purposes of this Agreement, Project means _________________________. 2. Confidential Information. The term Confidential Information means any information disclosed by DTE, or on behalf of DTE, to Recipient, whether written, oral or otherwise and includes, but is not limited to, any and all technical, business or financial information or property owned by or licensed to DTE or otherwise relating to DTE and/or any of its affiliates and related entities which is disclosed to Recipient, including but not limited to information regarding products, processes, personnel, finances, operations, trade secrets, know-how, formulas, data, network configuration, strategic partners, drawings, proprietary information, marketing, strategic or other plans, energy generation, transmission or distribution costs, customer names or lists, prices, or any other non-public information. Confidential Information includes information disclosed prior to formal institution of the Project, during the Project, or after formal termination of the Project. Confidential Information also includes written notes, memorandum, analyses, studies or reports made or prepared by Recipient or it